DJI Power 500 product referenceManufacturer media · reference image
DJIPORTABLE POWER

DJI Power 500

DJI, UGREEN and EcoFlow portable power stations for qualified importers requiring destination-specific voltage, plug and battery review.

  • 512 Wh LFP capacity
  • 1,000 W continuous AC output
  • Dual 100 W USB-C ports
CONFIGURATIONVoltage, plug and charging options reviewed per market
TARGET MARKETSAfrica · South America · Central America · Middle East · Russia & Iran: enhanced transaction review
WHOLESALE PRICEProvided after stock and route review
MOQ & LEAD TIMEConfirmed in the formal quotation

Procurement facts and verification limits

Manufacturer reference region
Not specified in structured catalog data; confirm the destination edition.
Requested configuration
Not specified. Confirm the exact regional edition in your RFQ.
Model code
Not specified in the catalog; request the manufacturer code.
Compatibility
No structured compatibility verification recorded. Existing manufacturer notes remain references, not a compatibility guarantee.
Commercial status
Catalog reference only. Price, stock, MOQ, lead time, destination suitability, warranty territory and transport acceptance require a formal quotation. No order is placed by reading these resources.

Read this product as Markdown · Buyer Resources and downloads

Before requesting a quote

Send a buying brief we can verify.

Capacity, AC specification, transport documents, plug type and carrier acceptance are reviewed per destination.

  • Registered buyer company and contact
  • Destination country and intended sales channel
  • Exact quantity, timing and preferred trade term
  • Required bundle, plug, film style or accessory mix

Independent buyer education

Continue with verified category guidance.

BUYING GUIDEOrdering EcoFlow DELTA 3 for Europe: check the label, not just the series name2 min read · Read guide ↗BUYING GUIDEDELTA 3 Max Plus: turn watts and watt-hours into a useful buying brief2 min read · Read guide ↗BUYING GUIDERIVER 3 backup use: qualify the workload before promising continuity2 min read · Read guide ↗